Thirty minutes, five stops
The shape of the Wednesday, September 16 check-in, 3:00 to 3:30 pm ET, in the half hour we have. Every stop links to its detail further down the page. Check items off as you go; the page keeps score.
Where the pool landed
Nominations closed Monday, September 14 at 32 submissions covering 41 organizations, right in the middle of the range PCI hoped for. PCI assessed and ranked the full pool on Monday.
Context: the boardWhere the invitations stand
PCI sent the initial invitations to a shortlist of 25 organizations on Monday evening, September 15, and put the remaining 16 on a waitlist. By mid-afternoon 7 had accepted through the seat form, none had declined and 18 were still out, with seat confirmations closing Friday. The new responses view on the dashboard tracks each one.
Context: the sequenceThe open calls
November 16 and the calendar-invite sender were settled at the Sept 16 check-in. The other two were settled Sept 25 and 27: 25 nonprofits hold seats across the two cohorts, and the Monday cohort's Lab 3 stays on Monday, October 12.
Context: open itemsStorytelling and comms
The shape was agreed on September 2. Pick a date for the working session.
Context: open itemsNext steps and owners
Who does what between now and Lab 1 on September 28, tied to the confirmed dates.
Context: what is aheadSeven sessions, sixty-two decisions
Every card below is drawn from the meeting transcripts. The short list shows what shaped the program most. Expand any card for the full decision record from that session, including the reasoning that was given in the room.
The architecture
- Two cohorts of 25, seven weekly 90-minute labs, same content twice
- Teach how to think about AI, not tool tricks. Tactics expire, judgment compounds
- Two hands-on people per organization, not one senior leader
- WF staff on personal devices. WF data never leaves the container
All decisions from this session
- No AI notetaker on WF-hosted meetings. WF security policy; fine when RW Institute hosts.
- Program structure confirmed: 2 cohorts up to 25, seven weekly 90-minute sessions each. Workable facilitation size while reaching more people.
- Curriculum philosophy: strategic capability over tool-specific tactics. Tool tactics go stale within months; judgment about data, model choice, and consequences endures.
- Every participant gets a paid Claude account, with other tools introduced situationally. Free tiers make most of the curriculum impossible.
- WF participants on personal devices. WF systems are air-gapped; personal devices let staff use the full toolset.
- Apple Silicon Macs recommended; hardware question added to intake. The newest tooling performs best there.
- Recruit two operational doers per organization. Pairs double the odds that change sticks back home.
- RW Institute drafts the invite and a readiness self-assessment quiz. Recruitment needs qualifying language and a self-selection tool.
- Session summaries within 48 hours. Standard delivery model.
Left open that day
- Concurrent versus staggered cohorts, final launch date, selection criteria, and whether WF grant materials become shared curriculum content.
The application era
- Direct apply-now path superseded Jul 24
- Cohort mix of 10 orgs plus 5 WF staff superseded Jul 24
- Hard line: no real Wells Fargo data in the labs, ever
- Monday and Friday parallel tracks, locked day choice, Friday moved to 10:00 Central
- The name is PCI. Recruitment lands the first two weeks of August
All decisions from this session
- Application simplified to a direct apply-now path. Avoids the multi-step back-and-forth. Later replaced by nomination.
- One unified application per pair, not two forms. The organization self-identifies both people at once.
- Two participants per organization required for this run. Breakout homework runs in pairs; two voices are more compelling back home.
- Cohort of about 10 organizations plus 5 WF staff seats, overflow to a waitlist. The waitlist builds the Phase 2 case. Staff seats later moved out of the cohorts.
- No real WF data; practice data or participants' own non-WF data only. A clean, hard line, stated plainly in the room.
- Codex kept out of core curriculum, demo only in Lab 6. Useful context on cost and resilience, secondary to core content.
- Same content twice weekly, Monday and Friday, pairs commit to one track. Mixed days would split the pairs the breakouts depend on.
- Friday session shifted to 10:00 to 11:30 Central. 9:00 Central is very early for Pacific participants.Later changed: the confirmed times are Cohort A Mondays 12:00 to 1:30 PM Central and Cohort B Fridays 11:00 AM to 12:30 PM Central.
- Recruitment targeted to the first two weeks of August. Clears WF's late-September internal commitments and gives leads time.
- The entity is called PCI, Philanthropy and Community Impact. Official name, used in all materials since.
- Recruitment comms split into two audiences: nonprofits and internal PCI. Different messages for different populations.
The refinement
- 25 per cohort, 50 total. Attendance bar: miss no more than two of seven
- Recruitment splits into two tracks: nonprofits public, PCI internal
- Start moves past Labor Day. Individual Claude accounts, covered by the grant
- A briefing package goes ahead of the leadership meeting with Molly Porter
All decisions from this session
- Recruitment split: nonprofit track through the public site, PCI track handled internally. Different processes for different populations; internal buy-in runs through the Foundation's chief administrative officer.
- The role question and all PCI references stripped from the application. Redundant once the tracks separated.
- Cohort sizing confirmed: 10 orgs times 2 people plus 5 PCI staff, 25 per cohort, 50 total. Verified in the room.
- Attendance policy: miss no more than 2 of 7 sessions, stated in the application. Competitive program; a clear bar helps applicants self-select. The room pushed to make it firm.
- Day choice locked per participant. Breakouts need the same recurring pairs.
- The two colleagues in a pair must come from the same organization, and attend the same day. Same tools, same systems, real mutual support.
- Recruitment timing: early August confirmed over late July. Lead time for PCI colleagues, buffer for internal approvals.
- Program start shifts past Labor Day, September 7. The week before is a dead zone; people return with a back-to-business mindset.
- Individual Claude accounts, not a team instance. Team minimums are inefficient at this scale, and participants keep their account and work after the program. Covered within the existing grant budget.
- Briefing package ahead of the Molly Porter meeting. That meeting produced both pivots we absorbed on July 24.
Worth knowing
- The specific calendar dates in the working plan came from the timeline document after this call. In the room, the agreements were early August recruitment and a post-Labor-Day start.
The pivots
- PCI steps out of the funded cohorts. Foundation grant, clean separation
- Nomination replaces open application. No organization ever hears a no
- Cap of two nominations per PCI member, outreach person to person
- A separate no-cost PCI upskilling track is approved in principle set aside Aug 17
- Verdict in the room: the launch holds
All decisions from this session
- PCI employees out of the funded nonprofit cohorts. The program is funded as a foundation grant, which requires strict separation between nonprofit partners and internal staff.
- Nomination replaces open application. A curated, relationship-led pipeline over mass sign-up. The guidance was to skew restrictive rather than open.
- The no-rejection flow: nominate, score and shortlist, invite to apply, place or hold. Only the nominating relationship manager ever knows the round-one outcome. The nonprofit never sees a rejection.
- Cap of two nominations per PCI member. Around 107 potential nominators; the cap keeps the pipeline strong without flooding it.
- Outreach through individual PCI working-group members, not one broadcast email. More effective and more selective.
- Weighted, scored rubric behind the nomination form. Hard disqualifiers became scored qualifying questions; ranking happens on the RW Institute side.
- Separate PCI-only upskilling track approved: about seven sessions, 90 minutes plus homework, no cost, run outside the grant. Real competency for PCI staff without touching the funded program's scope or budget.
- PCI working-group members may audit recorded cohort sessions. Observation access, cleanly separated from participation.
- Recordings and homework will live in a new participant-facing hub; PCI's SharePoint links out to it. One canonical home, no email distribution.
- Timeline reviewed live: at worst a week of slip, and we can make it up. The launch holds.
Confirmed and cleared
- Nominations now land in a shared visual dashboard, not email piles
- PCI Leadership confirmed the timeline: Sep 4 nominations through the Nov 16 close
- PCI staff participation set aside for this round; focus stays on the nonprofit track
- Scoring rubric shared as a standalone document; a storytelling strategy is requested
What landed across Aug 5 and the Aug 17 leadership review
- Nominations feed a shared, side-by-side review dashboard for the working group. Replaces email submissions; each nomination carries its readiness score and the nominator's rationale.
- Nomination tool tested end to end by PCI, including a live test nomination in the dashboard. Two-button confusion fixed to a single Submit; the review portal address corrected.
- Everything consolidated onto one domain, wf-ai-labs.rw.institute. One host for WF IT to allow, retiring the old vercel and netlify links.
- Timeline confirmed by PCI Leadership: nominations Sep 4, selections and invitations Sep 11, applications Sep 18, cohorts confirmed Sep 24, program starts the week of Sep 28, concludes Nov 16. Leadership had questions, so the initial compressed dates moved out to September.
- PCI staff participation set aside for this round. Leadership chose to emphasize internal AI training; the funded cohorts stay nonprofit-only.
- Scoring rubric extracted to a standalone document for PCI. One qualifier plus five readiness questions, scored 0 to 10, bands internal only.
- Rolling review approved. Nominations can be reviewed and invited as they arrive after Sep 4, rather than waiting for a single gate.
- Storytelling strategy requested by leadership. Sessions are recorded and the work is online, so stories can be mined and shared as the program runs. Approach to be planned with PCI.
The walkthrough
- Leadership heard the plan on Aug 17; the call for nominations waited only on the green light
- Invited organizations get a clear way to say yes or not now, on a short clock
- The confirmation step will ask about current tools and AI use, so the starting point is visible
- RW Institute holds both cohorts' calendar dates and stands up facilitator backup
All decisions from this session
- The plan was presented to foundation leadership on Aug 17; the nomination call moves the moment the green light lands. The hold point was named plainly so nobody assumed the call was already out.
- Every invited organization gets an off-ramp: take the seat or say it is not the right time, through the same link, on a short response window. A declined seat has to be visible fast so a new invitation can go out.
- The confirmation step collects background on the organization's current tools and AI use. The working group sees the real starting point, and mismatches surface before Lab 1 rather than in it.
- Invitations issued by the nominating PCI member from a shortlist. Relationship-led, matching the nomination model. Revised Sep 2: PCI sends directly with the nominator copied.
- RW Institute sends the calendar series for both cohorts to the PCI leads; how far the invites travel is PCI's call. The dates were held on RW calendars only, and PCI decides nominator visibility.
- Facilitator backup and a contingency behind it for the seven-week run. The dates are rigid, so delivery cannot depend on one person.
The pipeline opens
- Leadership cleared the call in late August; nominations are arriving on the dashboard
- First rolling review Sep 9, ahead of the Sep 14 close, with 5 to 10 seats held for the late rush
- Invitations go straight to the organization, nominator copied, as an opportunity to sign up
- A communications plan joins the agenda; promotion starts once the cohort is set
All decisions from this session
- The nomination call is out with PCI members, with a reminder to follow. A reminder makes sure every PCI member knows the call is live and open.
- First rolling review on Wednesday, Sep 9. PCI pulls the nominations received from the review dashboard on Tuesday afternoon or first thing Wednesday; its internal Wednesday check-in reviews fit and clears the first invitations. Review, acceptance, and any pass-along take time, and starting before the close spreads that work out.
- Invitations go in reviewed batches, strongest fits first, with 5 to 10 seats held until after Sep 14. Some nominators submit at the last second, and the reserve keeps room for that rush. Fit review weighs relationship history, not the score alone.
- PCI sends the invitation directly to the organization with the nominator copied, naming who put them forward. The fastest path, and it honors the nominating relationship: a nominator who sees the invite go out sees their intention carried through.
- The invitation is an opportunity, not an application: sign up if it fits, decline if not, inside a short window. Deferential language and an easy no keep seats moving to organizations that can use them.
- The Sep 16 biweekly runs the next batch of reviews and invitations. The standing check-in becomes the second review point.
- A communications plan joins the program. No open call, so public promotion starts once the cohort is set and features its members; PCI's communications partners get near-ready material to amplify. Leadership asked for it, and little else like this exists in the ecosystem to point to.
- RW Institute updates the invitation template and the seat-confirmation page to the agreed route and adds a comms section to the hub. The templates in the hub predate this call.
The invitations go out
- Nominations closed Monday, September 14 at 32 submissions, 41 organizations; invitations out with replies due September 17
- November 16 confirmed as the wrap; a separate showcase event for leadership and nominators to follow
- Lab 1's facilitator run-of-show reworked so Copilot is no longer the opening frame
- Nominator thank-you emails made standard practice going forward
All decisions from this session
- The Lab 1 run-of-show drops the Copilot walkthrough as its opening frame; Copilot and data anonymization are still covered, later in the sequence. Keeps the curriculum's opening on strategic capability, the philosophy set on June 11, rather than one tool's workflow.
- November 16 is the program wrap: Lab 7 has cohorts demo a completed workflow document in breakouts, no homework that day. A separate showcase event for Wells Fargo leadership and the original nominators will be added beyond Lab 7; its length, exact date, and placement around Thanksgiving are still to be worked out. Gives both cohorts a shared ending and gives leadership and nominators a way to see results.
- Nominator communications now include a standard thank-you email to whoever nominated an organization, alongside the invitation to the nominated organization itself. Closes the loop with the people who made the nomination possible, not only the organization invited.
- RW Institute confirmed it sends the cohort calendar series and account invitations to confirmed pairs, consistent with D24; the placeholder invite language is out of date and will be rewritten first.Later changed Sep 25: each participant sets up and owns a Claude Pro account, covered by Wells Fargo for six months, so no account invitations go out (D37).
Left open that day
- The partner-organization target per cohort: Wells Fargo to come back with a number.Settled Sep 25: 25 nonprofits across the two cohorts (D38).
- The October 12 holiday session: whether Cohort A's Lab 3 moves to Tuesday, October 13, or the Monday cohort is asked directly on their first day. Wells Fargo has not given a final answer.Settled Sep 27: the Monday cohort's Lab 3 stays on Monday, October 12, with no poll (D42).
- A date for the storytelling and comms working session.
- The showcase event's length, exact date, and placement around Thanksgiving.
What changed on July 24, and why it made the program better
Both pivots trace to one source: this program is funded as a foundation grant, and the grant requires a clean line between the funded nonprofit program and anything internal. Once that line was drawn, both changes followed naturally.
How organizations get in
Open application. Anyone with the link applies, we down-select, and some organizations receive a no.
PCI nomination. The people who know these organizations best put them forward. Every org only ever experiences an invitation.
Why it is better: the pipeline starts from relationships instead of reach, the bar skews selective, and no partner organization is ever told no. Overflow is held for the next round, invisibly.
How PCI participates
Five PCI staff seats inside each funded cohort, learning alongside nonprofit partners.
PCI steps out of the funded cohorts, so every funded seat goes to a nonprofit partner. Audit access to the recordings stays open to the working group.
Why it is better: the grant boundary stays clean and every funded seat reaches a nonprofit. A separate no-cost PCI upskilling track was approved in principle on July 24, then set aside by leadership on August 17 in favor of internal AI training. Individual PCI staff remain welcome at the open AI in Practice labs, which sit outside this program.
From a compressed plan to confirmed dates
The top lane is the compressed summer plan, the one that held an August recruitment window and a mid-September launch. The bottom lane is the timeline PCI Leadership confirmed on August 17. The intake model changed in July; the dates settled in August.
Updated Aug 28: the nomination deadline later moved to September 14 and review went to a rolling basis (decision D17). Every current-facing page reflects Sept 14; the lanes below show how the dates got here.
The path to Lab 1
Nominations closed Monday, September 14. The first rolling review ran Wednesday, September 9, PCI gave nominators a short extension, and the initial invitations went to 25 organizations on Tuesday, September 15, with 16 on the waitlist. Seat confirmations closed Friday, September 18. Cohorts were confirmed Thursday, September 24, with 25 nonprofits holding seats, and Lab 1 opens Monday, September 28.
Confirmed sequence
SetFour days of runway. Cohorts were confirmed Thursday, September 24, and Lab 1 opens Monday, September 28. Those four days carry the you're-in notes, the calendar invitations, each participant's own Claude Pro account and the pre-flight checklist. The review dashboard stays current, so the pool is always visible.
Three tracks, one calendar
Milestones and both cohorts on one line, from nominations to the November close. Toggle the tracks. Hover any dot for its date. The orange line marks today.
PCI staff participation Set aside this round
A separate, no-cost PCI upskilling track was approved in principle on July 24. On August 17, PCI Leadership set PCI staff participation aside for this round and chose to emphasize Wells Fargo's internal AI training instead. Every funded seat now goes to a nonprofit partner, which keeps the foundation-grant boundary clean. Individual PCI staff who want hands-on practice remain welcome at the open AI in Practice labs on Thursdays, a standing RW Institute event that sits outside this program. If leadership revisits an internal track later, the curriculum is ready to run.
What is live, what is fresh, what is queued
Everything runs on one domain, wf-ai-labs.rw.institute, so WF IT has a single host to allow. Every item below traces to a commitment made in one of the working sessions.
Live now
Updated recently
Queued
The open calls, options pre-framed
The June-through-September decisions are settled and live on the site. What November 16 means and who sends the calendar invites were settled at the September 16 check-in. The cohort size and the October 12 session were settled September 25. These are the calls still open, each with a recommendation and the consequence of each branch.
Storytelling and comms plan
ShapingSessions are recorded and the work is online, so progress, before-and-after samples, and feedback get captured in real time. With no open call, public promotion waits until the cohort is set, then features its members, with PCI's communications partners given near-ready material to amplify.
Cleaner to produce, but it forfeits the momentum and the in-flight moments that make the story land.
Leadership asked for a communications plan; the shape above was agreed on September 2. What remains is the working session to plan the story and data approach in detail.
Codex for the advanced pairs
Any time before Lab 6Lab 6 names Codex in the tool map and shows it if a participant asks. Nothing to provision, no time taken from the core session.
A stretch option so the strongest pairs can build a small utility themselves. Adds a purchasing step and a setup step before Lab 6.
Open since June. The lab runs as designed either way, so this can wait until Lab 6 is in view.
Recently settled
- Program name: the program is now Applied AI Labs for Nonprofits (September 25).
- Cohort size: 25 nonprofits hold seats across the two cohorts, which settles the partner-organization target (September 25).
- October 12: the Monday cohort's Lab 3 stays on Monday, October 12, with no poll (September 27).
- Claude accounts: each participant sets up and owns an individual Claude Pro account, and Wells Fargo covers the cost for six months. No account invitation goes out (September 25).
- Program wrap: November 16 is confirmed as the close. Lab 7 has cohorts show their work in merged rooms, and a separate leadership showcase for a few standout projects follows after Thanksgiving, likely December or January (date to be set).
- Calendar invites: RW Institute sends the cohort calendar series, once the out-of-date placeholder language is rewritten.
- Clearance to distribute: leadership cleared the nomination call in late August; it is out with PCI members.
- Invitation route: PCI emails the organization directly, nominator copied, framed as an opportunity with a short window and an easy decline.
- Review cadence: first rolling review ran September 9; PCI gave nominators a short extension, ranked the closed pool, and sent all 25 initial invitations on September 15.
- Nomination window: nominations closed September 14, on the confirmed PCI Leadership timeline.
- Seat form and decline: the dashboard card updates itself when an organization submits the seat form, and a "Not this time" button frees a seat on the spot.
- Attendance bar: participants may miss at most two of the seven sessions, set at nomination.
- Recruitment model: PCI nomination, not open application; every organization only ever receives an invitation.
- Recordings home: the participant hub is live; PCI's SharePoint links out to it.
- Rolling review: nominations are reviewed and invited as they arrive.
The next fourteen days, then the arc to November
The arc from here
The decision trail
Every decision that shaped the program, most foundational first. Superseded and retired decisions are kept behind the toggle so the arc stays visible.
Format: seven weekly ~90-minute sessions, live and recorded, delivered to two cohorts on set days. Participants pick one cohort day and stay with it, because the regular groups and breakout rooms depend on stable attendance.
Two people per organization, working the same real work as a pair. Same-org pairs strongly preferred; solo applicants go on a list and may be matched.
Every participant gets a paid individual Claude account with shared folders (not a shared team account), set up before Lab 1. A paid account comes with the seat and runs six months from the day an organization confirms.
The curriculum teaches real AI capability and how to think about the tools, not tool-specific tactics. Seven core competencies are the learning architecture; the first lab runs open, demo, build, debrief.
Data guardrail: participants work on personal devices and bring no Wells Fargo data. Anonymizing real data is taught conceptually, never performed on live Wells Fargo data, which stays inside the bank's environment.
A written session summary, the recording, and homework go out within about 48 hours of each session, with a walkthrough.
In all materials the funder is named "Philanthropy and Community Impact (PCI)," and never called a foundation.
Updated Sep 25: the program-name clause is now history (S6), replaced by D36.
Attendance: participants may miss at most two of the seven sessions. The commitment is set at nomination so people self-select in.
Recruitment is by PCI nomination, not open application. PCI members nominate partner organizations they already know and have engaged. This reversed the open-application model tried in June.
All funded cohort seats go to nonprofit organizations. PCI staff are not participants in the funded cohorts.
Capacity is about 25 organizations, two people each, split across two cohorts. Each PCI member nominates one or two organizations.
Intake flow: nominate, then a back-end review and shortlist, then a personal invitation, then the organization confirms its two seats. Nominations beyond capacity carry to a round-two pipeline; no organization is turned away.
The nomination form uses a gate question plus weighted, scored readiness questions, including an AI-readiness qualifier. Nominators never see the score; the shortlist is generated from the hidden scores.
Nomination outreach goes from working-group members to their own teams, selectively, not as a top-of-house blast. At most two nominations per member, to force deliberate prioritization.
Nominations feed a shared visual dashboard the PCI team can review side by side, replacing email-based submissions.
Program timeline confirmed by PCI Leadership: nominations due September 4, selections and invitations September 11, seat confirmations close September 18, cohorts confirmed September 24, program starts the week of September 28, and concludes November 16.
Nomination deadline moved to September 14 (from September 4), at PCI's request. Review and invitations run on a rolling basis; the downstream dates hold: seat confirmations close September 18, cohorts confirmed September 24, program starts the week of September 28, and concludes November 16.
Every invited organization gets an off-ramp: take the seat or say it is not the right time, through the same link, on a short response window, so a declined seat can be reissued. The confirmation step also collects background on the organization's current tools and AI use.
The nomination call is cleared and out with PCI members; nominations are reviewed on the shared dashboard as they arrive.
Rolling review cadence: the first review is Wednesday, September 9. PCI pulls the nominations received from the review dashboard on Tuesday afternoon or first thing Wednesday, its internal Wednesday check-in reviews fit and clears the first invitations, and the September 16 biweekly runs the next batch.
Invitations go in reviewed batches, strongest fits first as they clear review, with 5 to 10 seats held in reserve until after the September 14 close. Fit review weighs relationship history, not the score alone.
Invitation route: PCI emails the nominated organization directly with the nominator copied, naming who put them forward. It is framed as an opportunity to sign up, not an application, with a short response window and an easy decline so the seat passes to another organization.
A communications plan joins the program. With no open call, public promotion starts once the cohort is set and features its members; PCI's communications partners receive near-ready material to amplify. Stories are captured as the program runs.
Wells Fargo sends both the invitation and the you're-in note, from templates on the review dashboard, and records invited, reply, cohort day and welcome there by hand, because replies land in Wells Fargo mailboxes. Seat forms still arrive through the hub and show on the same board. RW Institute sends the calendar series.
Updated Sep 25: the account-invitation clause is now history (S7), replaced by D37.
When an organization submits the seat form, its card on the review dashboard updates itself. Wells Fargo does not get an email about it, though RW receives the same confirmation as a backup. Picking the cohort day, sending the you're-in note, and marking welcome sent still take a click from the Wells Fargo side.
A decline option was added to the seat page: a "Not this time" button lets a nominated organization say no on the spot, with an optional box asking to be kept in mind for a later cohort, so the seat opens up right away instead of waiting out the response window.
PCI is giving nominators a short extension past the Sept 9 review before sending the first round of invitations, to catch late submissions.
The goal is to have all initial invitations out by Wednesday, September 16, with some seats held open in case of a late run of nominations before the Sept 14 close.
PCI assessed and ranked the closed pool of 41 nominated organizations, sent the initial invitations to a shortlist of 25 on September 15, and placed the remaining 16 on a waitlist. Replies are tracked on the dashboard's responses view, one row per invited organization.
The facilitator run-of-show is being rewritten so a Copilot walkthrough is no longer the spine of the curriculum's opening. Copilot and data anonymization are still covered, later in the sequence rather than as the starting frame.
November 16 confirmed as the program wrap: Lab 7 has cohorts demo a completed workflow document in breakouts, no homework that day. A separate showcase event for Wells Fargo leadership and the original nominators will be added beyond Lab 7; its length, exact date, and placement around Thanksgiving are still to be finalized.
Nominator communications now include a standard thank-you email to whoever nominated an organization, alongside the invitation sent to the nominated organization itself.
Cohort sessions run on Zoom, not Teams, so every nonprofit can join easily. RW Institute manages the session invites and any follow-ups through a Zoom event page, with the Wells Fargo team included for visibility.
Showcase event approach confirmed: Lab 7 stays as the completed-workflow demo, and a separate session is added afterward, likely in December or January rather than immediately around Thanksgiving. It does not need to include every participant; a few standout projects would be enough.
Nominator CC policy confirmed: the organization's nominator is now copied on its welcome email alongside the primary contact, and the Claude-account language in that email is being clarified.
The program is now called Applied AI Labs for Nonprofits: the full name in page headers and at first mention, "the labs" after that. The public event page reads "Applied AI Labs for Nonprofits: Presented by Wells Fargo." Folder names, the domain, file names, page addresses, storage keys, database tables and form fields keep their old names. Supersedes the name clause of D7 (now S6).
Each participant sets up and owns an individual Claude Pro account, and Wells Fargo covers the cost for six months; RW Institute handles the monthly reimbursement. No account invitation goes out from Claude, RW Institute or anyone else. A participant whose organization already provides a Claude seat uses that. The account stays the participant's after the six months, and nobody at RW Institute or PCI can see a participant's chats or files. Supersedes the account-invitation clause of D24 (now S7) and sets the Claude-account wording D35 said was being clarified.
25 nonprofits hold seats across the two cohorts, two colleagues from each. This settles the partner-organization target left open on Sept 16.
Every lab gets a teaching layer so participants can use the same moves on other work: a line before each prompt saying what Claude will do, a short note after it on why it is asked that way and where else it works, a "Use it again" section in every kit, and a program-wide "Ways to ask Claude" section on the participant hub. Labs 3 to 7 carry it as they are rebuilt; Labs 1 and 2 are retrofitted later.
Lab 5's deck is started with Claude in the session and finished at home if it isn't done by the swap with the other organization.
The Monday cohort's Lab 3 stays on Monday, October 12, 12:00 to 1:30 PM Central, although Wells Fargo is closed for Columbus Day. There is no poll. This replaces D39.
Recruitment by open application: a shared link to a landing page, a fit quiz, then an application form.
Superseded Jul 24 by the PCI nomination model (D9).
Cohort composition of ten nonprofits plus about five Wells Fargo PCI staff per cohort.
Superseded Jul 24: all funded seats now go to nonprofits (D10).
Early-August recruitment with a start shifted to just after Labor Day.
Superseded Aug 17 by the confirmed PCI Leadership timeline (D16).
Compressed nomination window: open Aug 6, close Aug 14, invitations Aug 17, holding a September 14 launch.
Superseded Aug 17 by the confirmed PCI Leadership timeline (D16).
A separate, no-charge upskilling track for PCI staff (a distinct set of labs), later including a closed PCI-only session ahead of the nonprofit cohorts.
Retired Aug 17: PCI Leadership set PCI staff participation aside for this round.
The program name is "AI Working Labs," in all materials. Part of D7.
Superseded Sep 25: the program is now Applied AI Labs for Nonprofits (D36).
RW Institute sends the Claude account invitations to each confirmed pair. Part of D24.
Superseded Sep 25: each participant sets up and owns a Claude Pro account, so no account invitation goes out (D37).
October 12 goes to a poll of the Monday cohort. Columbus Day falls on their Lab 3, and the cohort's answer decides whether it stays on Monday, October 12 or moves to Tuesday, October 13. Participant pages write around the date until the result is in. This settles the holiday question left open on Sept 16.
Superseded Sep 27: the Monday cohort's Lab 3 stays on Monday, October 12, with no poll (D42).